Xiaoming Wang,Roel Leus,Stefan Creemers,Qingxin Chen,Ning Mao, A CTMDP-based Exact Method for RCPSP with Uncertain Activity Durations and Rework[C], OR2017 Conference – the annual international conference of the German Operations Research Society (GOR), Berlin, Germany: September 2017.
来凯,王小明*,陈庆新,毛宁,陈新度. 面向模具项目动态调度问题的优先规则对比研究[J], 工业工程, 2017, 20(5): 28-37
Xiaoming Wang, Xindu Chen, Qingxin Chen, Ning Mao, Zhantao Li. Statistical Analysis-based Method for Resource Decomposition in a Stochastic Multi-Project Environment[C]. 15th International Conference on Project Management and Scheduling, Valencia, Spain: April 2016.
Zhantao Li,Xiaoming Wang, Haidong Yang. A Rules-based Genetic Algorithm for Unrelated Parallel Machine Scheduling Problem with Energy and Tardiness Cost[C]. 15th InternationalConference on Project Management and Scheduling, Valencia, Spain: April 2016.
Xiaoming Wang, Qingxin Chen, Ning Mao, Xindu Chen, Zhantao Li. Proactive approach for RCMPSPbased on Multi-priority rule combinations[J]. International Journal of Production Research, 2015;53(4):1098-1110.
Zhantao Li,Jianjun Liu, Qingxin Chen, Ning Mao,Xiaoming Wang. Approximation algorithms for the three-stage flexible flow shop problem with mid group constraint [J]. Expert Systems with Applications, 2015; 42 (7): 3571-3584.
王小明,陈庆新,毛宁,陈新度. 资源与工期双重随机下的模具多项目监控[J]. 计算机集成制造系统. 2015;21(5): 1315-1326.
王小明,陈庆新,毛宁,刘建军,黎展滔. 考虑返修的模具剩余工期估计[J]. 机械工程学报.2014;50(7):199-208.
谢文砚,陈庆新,毛宁,王小明. 外协加工下模具项目调度方法研究[J]. 模具工业. 2014; 40 (8):7-11.
Zhan-tao Li, Qing-xin Chen, Ning Mao,Xiaoming Wang, Jianjun Liu. Scheduling rules for two-stage flexible flow shop scheduling problem subject to tail group constraint [J]. International Journal of Production Economics, 2013; 146(2): 667-678.
王小明,陈庆新,毛宁,刘建军. 随机环境下的模具项目交货期预测方法[J]. 计算机集成制造系统. 2012;18(2):405-414.
王宗忠,陈庆新,毛宁,王小明,彭杰.考虑热处理批量的模具制造网格服务配置算法[J]. 计算机集成制造系统. 2012;18(2): 437-447.
洪福,王小明,孟超,陈庆新,毛宁. 基于EVM的模具制造项目管理方法研究[J]. 模具工业. 2012; 38(11): 1-5.