Qu T, Lei S.P., Wang, Z.Z., Nie D.X., Chen X.*, Huang G.Q. 2015. IoT-based Real-time Production Logistics Synchronization System under Intelligent Cloud Manufacturing. International Journal of Advanced Manufacturing Technology. DOI:10.1007/s00170-015-7220-1. (SCI&EI)
Shi, Y., Qu, T* (Corresponding author), Chu, L.K. 2015. A dynamic Stackelberg game model for portfolio procurement by a risk-averse buyer. Industrial Management and Data Systems. Accepted. (SCI&EI)
Qu T, Nie D.X., Wang Z.Z., Chen X., Dai Q.Y., and Huang George Q. 2014. Optimal Configuration of Cluster Supply Chains with Augmented Lagrange Coordination. Computers and Industrial Engineering, 84, 43-55. (SCI&EI)
Li, Z. George Q. Huang, Fang, J. Qu, T* (Corresponding Author). 2013. Ontology-Based Dynamic Alliance Services (Odas) in Production Service System. International Journal of Computer Integrated Manufacturing, 27(2), 148-164. (SCI&EI)
Qu, T., Yang, H.D., Huang, G.Q., Zhang, Y.F. Luo. H. Qin, W. 2012. A Case of Implementing RFID-Based Real-Time Shop-Floor Material Management for Household Electrical Appliance Manufacturers. Journal of Intelligent Manufacturing, 23(6), 2343-2356. (SCI&EI)
Qu, T, Chen, X.D., Zhang, Y.F., Yang, H.D., Huang, G.Q. 2012. Analytical Target Cascading Enabled Optimal Configuration Platform for Production Service Systems. International Journal of Computer Integrated Manufacturing, 24(5), 457-470. (SCI&EI)
Qu, T, Bin, S., Huang, G.Q., Yang, H.D. 2010. Two-stage Product Platform Development for Mass Customization. International Journal of Production Research, 49(8), 2197-2219. (SCI&EI)
Qu, T. Huang, G.Q., Cung, Van-Dat, Mangione, Fabien. 2010. Optimal Configuration of Assembly Supply Chains Using Analytical Target Cascading. International Journal of Production Research, 48(23), 6883- 6907. (SCI&EI)
Qu, T., Huang, G.Q., Zhang, Y.F., Dai, Q.Y. 2009. A Generic Analytical Target Cascading Optimization System for Decentralized Supply Chain Configuration over Supply Chain Grid. International Journal of Production Economics, 127, 262-277. (SCI&EI)
Qu, T., Huang, G.Q., Chen, X., Chen, H.P. 2009. Extending Analytical Target Cascading for Optimal Supply Chain Network Configuration of a Product Family. International Journal of Computer Integrated Manufacturing, 22(11), 1012-1023. (SCI&EI)
Huang, G.Q., Qu, T* (Corresponding Author). 2008. Extending Analytical Target Cascading for Optimal Configuration of Supply Chains with Alternative Autonomous Suppliers. International Journal of Production Economics, 115, 39-54. (SCI&EI)
Thürer, M., Qu, T., Stevenson, M., Maschek, T. and Moacir Godinho Filho. 2014. Continuous Workload Control Order Release Revisited: An Assessment by Simulation. International Journal of Production Research, 52(22), 6664-6680. (SCI&EI)
Fang, J., Qu, T., Li, Z, Xu, G.Y., Huang, George Q. 2013. Agent-based Gateway Operating System for RFID-enabled ubiquitous manufacturing enterprise. Robotics and Computer-Integrated Manufacturing, 29(4), 222–231. (SCI&EI)
Huang, G.Q, Qu, T., Zhang, Y.F., Yang, H.D. 2012. RFID-enabled product-service system for automotive part and accessory manufacturing alliances.International Journal of Production Research, 50(14), 38, 21-3840. (SCI&EI)
Huang, G.Q., Qu, T., Zhang, Y.F., Maropolous, Paul G. 2011. Guest editorial: digital enterprise technology. Journal of Intelligent Manufacturing, 23(6), 2319-2321. (SCI&EI)
Huang, G.Q., Qu, T., Zhong, R.Y., Li, Z., Yang, H.D., Zhang, Y.F., Chen, Q.X, Jiang, P.Y., Chen, X. 2010. Establishing Production Service System and Information Collaboration Platform for Mold and Die Products. International Journal of Advanced Manufacturing Technology, 52(9-12), 1149-1160. (SCI&EI)
Huang, G.Q., Qu, T., Cheung, W.L., Liang, L. 2005. Extensible Multi-agent System for Optimal Design of Complex Systems Using Analytical Target Cascading. International Journal of Advanced Manufacturing Technology, 30(9-10), 917-926. (SCI&EI)
Zhang, Y.F., Qu, T., Ho, O.K.W. Huang, G.Q. 2009. Agent-based Smart Gateway for RFID-enabled Real-Time Wireless Manufacturing. International Journal of Production Research, 49(5), 1337-1352(16). (SCI&EI)
Zhang, Y.F, Qu, T., Oscar Ho and George Q. Huang. 2011. Real-Time Work-In-Progress Management for Smart Object Enabled Ubiquitous Shop Floor Environment, International Journal of Computer Integrated Manufacturing, 24(5), 431 - 445. (SCI&EI)
Huang, G.Q, Qu, T., Fang, J, Bramley, A. 2011. RFID-enabled Gateway Product Service System for Collaborative Manufacturing Alliance. CIRP Annals - Manufacturing Technology, 60(1), 465-468. (SCI&EI)
Wang, M.L., Qu, T., Dai, Q.Y., Zhang, X.W., Zhong, R.Y., He, J.B. 2011. A RFID-Enabled Real-Time MES for OKP Manufacturing: A Case Study in Mould Industry. International Journal of Computer Integrated Manufacturing, 25(1) , 20-34. (SCI&EI)
Wang, Z.Z., Qu, T. Chen, Q.X., Luo, H. and Mao, N. 2012. Resource Model and Service Match Algorithm of Mould Manufacturing Grid. International Journal of Computer Integrated Manufacturing. 25(11), 1011-1028. (SCI&EI)
Huang, G.Q., Qu, T., Zhang, Y.F., Maropoulos, P.G. 2011. Guest editorial: digital enterprise technology for the special issue of ‘6th CIRP-Sponsored International Conference of Digital Enterprise Technology (DET2009). Journal of Intelligent Manufacturing. (SCI&EI)
Thürer, M., Stevenson, M., Qu, T., and Godinho Filho, M., 2014, The Design of Simple Subcontracting Rules for Make-to-Order Shops: An Assessment by Simulation, European Journal of Operational Research, 239(3), 854–864. (SCI&EI)
Thürer, M., Stevenson, M., Qu, T. 2015. Simple Subcontracting Rules for Make-to-Order Shops with Limited Subcontractor Capacity: An Assessment by Simulation. Production Planning and Control. DOI: 10.1080/09537287.2015.1019590. (SCI&EI)
Thürer, M., Stevenson, M., Qu, T. 2015. Practical Aspects of Job Sequencing and Selection within Workload Control Order Release: An Assessment by Simulation. International Journal of Production Research. Accepted. (SCI&EI)
Huang, Y., Wang, K., Qu, T. 2015. Multi-level Green Supply Chain Coordination with Different Power structures and Channel Structures Using Game-theoretic Approach. International Journal of Logistics Management. Accepted. (SCI&EI)
Zhong, R.Y., Dai, Q.Y., Qu, T., Hu, G.J., Huang, George Q. 2013. RFID-Enabled Real-Time Manufacturing Execution System for Mass-Customization Production. Robotics and Computer Integrated Manufacturing. 29(2), 283–292. (SCI&EI)
Yang, H.D., E, J.Q., Qu, T. 2012. Multidisciplinary design optimization for air-condition production system based on multi-agent technique. Journal Central South University of Technology. 19(2), 527−536. (SCI&EI)
Zhang, T. Huang, George Q., Qu, T., Li, Z. 2013. Headquarter-centered common sourcing management through order coordination and consolidation. Computers & Operations Research, 40(8), 2011–2025. (SCI&EI)
屈挺*,张凯,罗浩,王宗忠等. 物联网驱动的“生产-物流”动态联动机制、系统及案例. 机械工程学报,2015.
聂笃宪,屈挺*,陈新,陈新度,黄国全. 基于ALC的集群式供应链动态优化配置方法. 计算机集成制造系统,20(12),2014.
徐杰,屈挺*,聂笃宪,陈新,黄国全. 基于持续抽检的电力物资多阶段动态采购模型及系统. 工业工程,2015.
王晶,屈挺*,王宗忠,罗浩,黄国全. 工业园区统一授信模式下的动产质押企业资质及动产评估模型. 工业工程,2015.
屈挺*,陈艳,王宗忠,陈新度,戴青云,黄国全. 制造物联网系统动力学建模与分析. 2015,18(3),工业工程.
聂笃宪,屈挺*,陈新,雷涛,黄国全. 面向多源采购的多级供应链优化配置方法. 工业工程,17(4),2014.
雷涛,屈挺*,聂笃宪,黄国全. 产能约束下的多级装配供应链优化配置方法研究. 工业工程,17(5),2014.